Skip to content
Capilano Courier
Menu
  • Home
  • Sections
    • News
    • Features & The Profile
    • Arts & Culture
    • Letters
    • Humour
    • Video Production
  • About
    • Advertise
    • Contribute
  • Meet the Crew
  • Online Issues
  • Events
Menu

CSU office renovations to continue through October 

Posted on September 18, 2017September 23, 2017 by Rachel D'Sa

Upgrades look to improve layout and add extra workstations 

Rachel D’Sa // Arts and Culture Editor  

 

Staff, executives and other members of the Capilano Students’ Union (CSU) will have to continue working in the conference room until office renovations finish. The upgrades, which began in late August, are scheduled to finish in early October. The current administration office, located in Maple 116, has long needed important changes. 

The scope of the project is not major, and its focus is on changing the layout of the office to be compliant with privacy legislation. These changes will also create more room to introduce additional workstations in the future. “The renovation will allow us to increase our operational capacity by having a more productive workspace,” said Perry Safari, CSU president and vice-president, finance and services.  

The cost estimate for this project is $170,654. Part of the amount will act as a float for a contingency fund of 10 per cent ($10,800), and allows for unanticipated costs. Ideally, this will not be used. Another expense addressed prior changes made to the building due to code requirements for sprinkler systems. This has led to the legal obligation of installing sprinklers which will cost $12,000.  

It has been at least a decade since the last renovation to the administration office space and the student union also has plans for a new CSU building. At this time, there is no information available regarding when the project will begin or how much it will cost, as the process of getting the plans approved is extensive. As of right now there are no indications as to where the new establishment will be placed with the already limited space on campus. 

Safari spoke about the matter of the process stating, “We have a Joint Steering Committee in which designated CSU directors discuss with University administration on the terms and conditions of a student union building on campus. Our Joint Steering Committee must await the University administration to complete a final draft of their Campus Master Plan before we proceed in our joint meetings. Therefore, the construction of a student union building is dependent on when and how the masterplan draft is completed.” 

Safari went on to say that the renovation is very valuable. The new office floor plan is imperative, playing an important role in the particular staff structure. He also mentioned that throughout the office renovation period, the staff have not at all been affected. Instead, they have been working in the conference room with little to no changes in work productivity. 

This office refresher will provide a more efficient workspace while at the same time securing crucial safety and privacy concerns. Though seemingly unnecessary, due to plans for a new CSU building, the current renovation ensures continued success for the student union and its staff.  

Category: Campus Life

Post navigation

← “Let’s Get Consensual” 
You want me to do what?!  →

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Upcoming Tabling Hours: Thursdays, 12:00 p.m. to 2:00 p.m., at either the Learning Commons entrance (LB 126) or Birch Cafeteria.

Latest News

  • The Collateral Damage of Cutting Courses
    As CapU faces financial woes, students are being forced to take required courses elsewhere  Ben Taylor (he/him) // Crew Writer   Jasmine […]
  • Deficit Mitigation Proposals Meet Outdated Policies
    The key policy grey areas impacting Senate’s role in high-stakes decisions Laura Morales Padilla (she/her) // Co-EIC & Ilustrator  The […]
  • CapU Introduces Protest Guidelines
    Capilano University quietly introduces guidelines for protests on campus, emphasizes campus grounds are ‘private property’  Jolee Wen […]
  • CapU Announces the Closure of Sunshine Coast Kálax̱-ay Campus and the ‘not closure’ of CapU Lonsdale
    Administration consolidates two key satellite campuses as financial woes continue  Ren Zhang (they/they)  // Contributor & […]
  • Major Win for CapU Student Workers   
    New Student Employee Union Gets Wage Increase  Mayumi Izumi (she/her) // Contributor Rachel Lu (She/Her) // Illustrator Organizers at […]
  • Orange Pilled
    Vancouver Mayor Ken Sim’s Bitcoin Obsession   Ben Taylor (He/Him) // Crew Writer   Alex Baidanuta (She/Her) // Illustrator    […]
Video Production
Could you tell what’s real anymore?
CapU students try to spot the AI.
Is It Real or AI?
Subscribe
What even is a Zine? Mia shows us a behind the scene of how this little publication comes together, the vision behind it, and how to become a paid contributor of the C.C. Crumb!
Indigenous power means something different to every student, but it always begins with voice, community, and truth. Hear what CapU students had to say.
What does campus clean-up day look like?
© 2026 Capilano Courier | Powered by Minimalist Blog WordPress Theme