Skip to content
Capilano Courier
Menu
  • Home
  • Sections
    • News
    • Features & The Profile
    • Arts & Culture
    • Letters
    • Humour
    • Video Production
  • About
    • Advertise
    • Contribute
  • Meet the Crew
  • Online Issues
  • Events
Menu

CSU office renovations to continue through October 

Posted on September 18, 2017September 23, 2017 by Rachel D'Sa

Upgrades look to improve layout and add extra workstations 

Rachel D’Sa // Arts and Culture Editor  

 

Staff, executives and other members of the Capilano Students’ Union (CSU) will have to continue working in the conference room until office renovations finish. The upgrades, which began in late August, are scheduled to finish in early October. The current administration office, located in Maple 116, has long needed important changes. 

The scope of the project is not major, and its focus is on changing the layout of the office to be compliant with privacy legislation. These changes will also create more room to introduce additional workstations in the future. “The renovation will allow us to increase our operational capacity by having a more productive workspace,” said Perry Safari, CSU president and vice-president, finance and services.  

The cost estimate for this project is $170,654. Part of the amount will act as a float for a contingency fund of 10 per cent ($10,800), and allows for unanticipated costs. Ideally, this will not be used. Another expense addressed prior changes made to the building due to code requirements for sprinkler systems. This has led to the legal obligation of installing sprinklers which will cost $12,000.  

It has been at least a decade since the last renovation to the administration office space and the student union also has plans for a new CSU building. At this time, there is no information available regarding when the project will begin or how much it will cost, as the process of getting the plans approved is extensive. As of right now there are no indications as to where the new establishment will be placed with the already limited space on campus. 

Safari spoke about the matter of the process stating, “We have a Joint Steering Committee in which designated CSU directors discuss with University administration on the terms and conditions of a student union building on campus. Our Joint Steering Committee must await the University administration to complete a final draft of their Campus Master Plan before we proceed in our joint meetings. Therefore, the construction of a student union building is dependent on when and how the masterplan draft is completed.” 

Safari went on to say that the renovation is very valuable. The new office floor plan is imperative, playing an important role in the particular staff structure. He also mentioned that throughout the office renovation period, the staff have not at all been affected. Instead, they have been working in the conference room with little to no changes in work productivity. 

This office refresher will provide a more efficient workspace while at the same time securing crucial safety and privacy concerns. Though seemingly unnecessary, due to plans for a new CSU building, the current renovation ensures continued success for the student union and its staff.  

Category: Campus Life

Post navigation

← “Let’s Get Consensual” 
You want me to do what?!  →

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Latest News

  • International Tuition Increase Approved, and 432 Letters From Students Disregarded
    Tuition fees have increased by five per cent for all international students, and a substantial portion of the student body is disappointed […]
  • Carney Says Canada to Recognize Palestine
    Western powers align, but little to change on the ground    Theodore Abbott (he/him) // News Editor   As Israel prepares to force […]
  • AI Slop: ChatGPT Shown to Kill Brain Gains
    A recently published study from MIT brings to light the effects of relying on AI models to think critically for us   Kayla Price […]
  • Stalled Negotiations for Unionized Student Employee Wages
    The MoveUP union and Capilano University fail to find common ground to start negotiations that would address the urgent issue of student […]
  • Cybersecurity Breach at CapU
    Reporting on the recent phishing incident that encouraged students to send $850 to scammers Yasmine Modaresi (she/her) // News Editor […]
  • 2025 CSU Election—Record number of disqualifications & three directors removed from office
    The trend towards greater rates of participation in CSU elections after the pandemic is interrupted, and the rise of disqualifications had […]
Video Production
Join Adam and Ben as they share their favorite money-saving tips for getting the most out of your fast food runs. From sneaky menu tricks to wallet-friendly hacks, you won’t want to miss this episode.

📖 Read the full issue and more:
https://www.capilanocourier.com/
📲 Follow us for updates, stories, and behind-the-scenes:
/ capilano.courier
Fast Food Life Hacks
Subscribe
© 2025 Capilano Courier | Powered by Minimalist Blog WordPress Theme